Both the horizontal and vertical stabilizers are built and rough sanded. Sheeting was added top and bottom of the stab. I did this to enable sanding and shaping a pronounced symmetrical airfoil shape plus a thicker trailer edge to desensitize pitch. Dowel hardpoints were also added and drilled for control horns to each elevator half.
No comments:
Post a Comment